Frigate Proven Design Criteria
INTRODUCTION Ship acquisition program is a very sensitive issue, thus the choice of a proven design warship tops the list. The cost of Frigate acquisition is very prohibitive that it requires a careful evaluation and analysis of the Ship Systems Work Breakdown Structures (SSWBS), an itemized cost distribution of various components of the ship versus the desired requirements and capability…